Project Profile: Jacob E. Manch Elementary

By Premier SIPS on March 31, 2014 in Project Profiles
0
0

We are excited to add a ‘Project Profiles’ section to our blog. Here you will find details/photos on completed SIPs projects and see how versatile SIPs can be for many different building applications such as: Residential, Commercial, Multi-Family Housing, Education and Native American. We will constantly add to our Project Profile collection. Click on the black ‘Follow’ button to the right to receive automatic email updates as new stories and project profiles are posted. Feel free to contact us directly with any questions.

PROJECT PROFILE: Jacob E. Manch Elementary | Las Vegas, Nevada | View Project Profile (pdf)

“This was the fastest form of construction we have ever used, we have built with CMU, Steel, Wood framing, you name it and these SIPs were the best thing we have ever experienced on a job of this magnitude.” – Martin Harris Construction

Jacob E. Manch Elementary, Las Vegas, NV

Jacob E. Manch Elementary, Las Vegas, NV

School districts across the United States are increasingly under pressure to manage capital construction and operating costs. When new or remodel construction is needed, many face numerous hurdles, including rapid student population growth requiring larger facilities, and limited funding from local tax levies to pay for building development, along with energy costs to provide a conducive learning environment.

When Clark County School District (Las Vegas, NV) began to plan a new elementary school with a tight budget and construction schedule, project architects SSA Architecture of Las Vegas recommended incorporating structural insulated panels, SIPs, in all exterior walls and roofs for a more efficient and systematic approach to the building’s structure.

The Jacob E. Manch Elementary School is a replacement for an existing building originally constructed in 1963. During the preliminary design stages, the architects determined that materials customarily used in the district – primarily concrete masonry units (CMUs) and tilt-up concrete panels – would not be cost feasible within the approved $20M budget. In addition, with rapidly rising energy costs, the school district was looking for a solution that would reduce heating and cooling demands.

Prior to SIPs, contractor had allocated 12 men for the electrical installation, ended up needing only 3 and reduced their original bid by over $950,000.

Prior to SIPs, contractor had allocated 12 men for the electrical installation, ended up needing only 3 and reduced their original bid by over $950,000.

SIPs Provided the Following Benefits for Jacob E. Manch Elementary:

  1. COST SAVINGS:  Saved approximately one million dollars in direct construction costs
  2. SPEEDY CONSTRUCTION:  Reduced the framing schedule from a typical 118-220 days to 45 days (a nearly 80% time savings)
  3. REDUCED HVAC REQUIREMENTS:  Reduced HVAC requirements by approximately half, providing both initial capital savings and lower annual heating and cooling bills
  4. REDUCED WASTE:  Decreased construction materials waste and resulting disposal fees and environmental impacts
  5. REDUCED INTERIOR NOISE:  Reduced interior noise coming from nearby Nellis Air Force Base

View Project Profile (pdf)

 

Jacob E. Manch Elementary, SIPs installation

Jacob E. Manch Elementary, SIPs installation

Project Details

 

 

 

 

SIP QUESTIONS

Joe Pasma, PE, Premier SIPS Technical Manager

Joe Pasma, PE, Premier SIPS Technical Manager

Contact Joe Pasma, PE, Premier SIPS’ Technical Manager

800.469.8870 x104

joe.pasma@premiersips.com

Ask Joe to Connect With You on LinkedIn | Follow Premier SIPS on LinkedIn

Read more on Premiersips.com

About the Author

Premier SIPSView all posts by Premier SIPS

0 Comments

Add comment

Leave a Reply

Your email address will not be published. Required fields are marked *

*